See the organization on another date
Open the structure as it stood, or will stand, on any date that has a change.
Choose a date
- On Design Studio, open the date menu at the top, beside the tabs. It appears once the organization has changes on more than one date.
- Pick a date. The boxes, the summary and the rule checks all follow it.
- Latest returns to every change recorded so far.
What the dates are
The menu lists the effective dates of the organization's changes. A change recorded with a future date shows up when that date, or Latest, is chosen.
Walk the days on the line
Above the views, History draws those days on a line, once there is more than one. What has happened is drawn full and what is still to come pale, with Today between them.
- Every day with a change is a point. Its shape and colour say what happened: a draft published, people joined or left, a temporary structure started or closed, or other changes. Hollow points are still to come: a later day, or a wave that waits for its day. A diamond is the planned end of a temporary structure.
- Point at a day, or move to it with the Tab key, to read its date, how many changes it holds and the first of them.
- Choose a point to see the organization on that day. The arrows beside Play history go one day back and one day on, and Today returns to now.
- The ring on the day on screen can be dragged along the line to the nearest day. With the ring in focus the left and right arrow keys walk the days, Home goes to the first and End to the last.
- Compare with sets the day on screen against an earlier day. Every view then marks what is new, changed, moved and removed between the two, a line above the view counts them, and under the line the days between and what the rules find on each of the two days stand side by side. Stop comparing lets it go.
- The label beside the date says which way you are looking: How it was, Today or How it will be. Under the line, open the sentence that starts with the day to read everything that happened on it.